Manufacture and installation of 1,400.00 meters of railings for Railway Bridge over the Rio Ozama – Santo Domingo Metro, OPRET.

March  – July 2016.


Bridge Railings Metro Bridge – Grupo Malespin
Bridge Railings Metro Bridge – Grupo Malespin
Bridge Railings Metro Bridge – Grupo Malespin
Bridge Railings Metro Bridge – Grupo Malespin
Bridge Railings Metro Bridge – Grupo Malespin
Bridge Railings Metro Bridge – Grupo Malespin
Bridge Railings Metro Bridge – Grupo Malespin
Bridge Railings Metro Bridge – Grupo Malespin
Project details
  • Categories:
  • Start:March 2016 
  • End:July 2016