Package No.3 Civil, structural, mechanical, and electrical construction facilities for the expansion project of the Pueblo Viejo gold mine including Package No.3 which includes works in the following areas:

Area 4141 – Pressure Oxidation (POX): Upgrade for autoclaves, installation of new tanks and pumps in charge and flash thickening areas.

Area 4163 – HDS 2 Thickener Upgrade: Change of structural and mechanical components in Copper Recovery Thickener for its adequation to HDS 2. Installation of pumps.

Area 4122 – Iron 1 Transfer Station: Mechanical installation of new pump station in Iron Tanks.

Area 6163 – Cooling Towers: Installation of 5 cooling towers with their respective pumps.
Pueblo Viejo, DR, Feb 2021 – in progress

Package No.7. Assembly in modules and installation of 700 tons of pipe rack structure, with a length of 1,400 meters.
Installation of 14,000 meters of pipes of different diameters (18″, 24″, 32″, 36″) and different materials (HDPE, Titanium, SS 316)
Pueblo Viejo, DR, June 2021 – In progress.

Expansion Project  – PVDC (Barrick)
Expansion Project  – PVDC (Barrick)
Expansion Project  – PVDC (Barrick)
Expansion Project  – PVDC (Barrick)
Expansion Project  – PVDC (Barrick)
Expansion Project  – PVDC (Barrick)
Expansion Project  – PVDC (Barrick)
Expansion Project  – PVDC (Barrick)