Installation of mechanical and piping works for the expansion of the existing AES LNG Terminal in Andrés, Boca Chica, Dominican Republic. These works include the prefabrication and erection of 1,200 tons of steel structure in the pipe rack for the new 120,000 M3 LNG storage tank, complete piping works for the new facilities, including 3 hot-tappings and tie-ins between the new and existing facilities, prefabrication and installation of 62,00 DI of piping for criogenic, CS,HDPE, and GRP systems. Mechanical installation of 1,424 tons of equipment for the new facilities including 3 criogenic compressors, construction and mechanical installation of the new Truck Loading System, and installation of outdoor and indoor firefighting systems.
November 2021 – in progress.

AES LNG EXPANSION PROJECT – POSCO E&C
AES LNG EXPANSION PROJECT – POSCO E&C
AES LNG EXPANSION PROJECT – POSCO E&C
AES LNG EXPANSION PROJECT – POSCO E&C
AES LNG EXPANSION PROJECT – POSCO E&C
AES LNG EXPANSION PROJECT – POSCO E&C
AES LNG EXPANSION PROJECT – POSCO E&C
AES LNG EXPANSION PROJECT – POSCO E&C