Electromechanical installation of 10 gas turbines for 230MW power plant, and fabrication and interconnection of 140m of 8″ gas pipeline with the main line of the Gasoducto del Este Pipeline including a Horizontal Directed Drilling (HDD) section of the Autopista del Este Highway and Hot Tapping of 20″x8″ to existing gas pipeline. Supply, manufacture, and assembly of pipes for the “BOP” including gas, diesel, air, and lube oil, in addition to grounding system, cathodic protection, exterior lighting, and electric feeding. Also, the installation of 2 turbines type T-250.
June 2022 – in process

SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
SIBA 230 MW POWER PLANT – SIBA ENERGY
Project details
  • Categories:
  • Start:June 2022
  • End:In Process