Civil, mechanical, instrumentation, control, and electrical installation of a 7.2 km gas pipeline for a 414 MW thermoelectric power plant. The pipeline includes excavation and refilling of 40,000 m3, installation of 7.2 km of 12″ Scl 80 pipeline and welding of 8,000 DI, Installation of traps for cleaning pigs, Horizontal Directed Drilling (HDD) at special road crossings, leak testing, pre-commissioning, inerting, and non-destructive testing, installation of instruments for gas measurement, fiber optics, cathodic protection, grounding and feeding of power equipment.
November 2022 – in progress

Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000
Gas Pipeline For Manzanillo Thermal Power Plant 414 MW – Energía 2000