Engineering and rehabilitation / construction of the storage and distribution system of Diesel Oil in the AES Andres power plant including supply and installation of 4, 6, and 12 inch piping system for a total welding of 4,038 DI, habilitation of firefighting system including Foam system, hydrostatic tests and cleaning, precommissioning
June 2022 – January 2023