Assembly in modules and installation of 700 tons of pipe rack structure, with a length of 1,400 meters.
Installation of 14,000 meters of pipes of different diameters (18″, 24″, 32″, 36″) and different materials (HDPE, Titanium, SS 316)

Pueblo Viejo, DR, June 2021 – In progress