This post is also available in: Español (Spanish)
Supply and manufacture of 375 tons of embedded metallic structures, 750 tons of pipping supports and various other structures.
Punta Catalina Project, Baní – DR. July – August 2018.
This post is also available in: Español (Spanish)
Supply and manufacture of 375 tons of embedded metallic structures, 750 tons of pipping supports and various other structures.
Punta Catalina Project, Baní – DR. July – August 2018.